Renovation Guide

Handover checklist before approving the final payment release

What to check, room by room, before you approve each trade's final release.

Handover checklist beside a finished living room

Check each trade's work when it finishes, not only at the end. Problems are easier to fix before the next trade builds on top of them. On My Direct Reno, money is released to a subcontractor only after you approve the work for that stage, so check before you approve.

Tiling and wet areas

  • Tap tiles lightly. A hollow sound can mean poor bonding.
  • Pour water on bathroom and balcony floors. It should run to the floor trap and not pool.
  • Look for even grout lines, and no chipped or lipped tiles.

Electrical

  • Test every socket, switch and light point.
  • Ask for the circuit labels on the distribution board.

Plumbing

  • Run every tap and flush every toilet. Check under sinks for leaks.
  • Check that hot water reaches each point it should.

Carpentry

  • Open and close every door and drawer. They should align and close softly.
  • Check edges and laminate joints for gaps or lifting.

Painting and finishing

  • Look at walls in daylight for patches, drips and uneven colour.
  • Check that switch plates, door frames and floors are free of paint.

Before you approve the final release

  • Compare the finished work with the scope and materials in the quotation you accepted.
  • List defects in writing with photos, and agree a date for fixing them. If they are not put right, open a case from your job page; unreleased payouts are paused while it is reviewed.
  • Collect warranties, manuals and any keys or remote controls.

General information only, not professional advice.

Go to My account

More guides

Home Renovation Handover Checklist | My Direct Reno