Renovation Guide

The usual order of renovation works

Which trade comes first, which comes last, and why the order matters.

Renovation site with an order-of-works checklist

Renovation runs from messy and hidden work to clean and visible work. Getting the order wrong usually means paying to redo something. This is the usual sequence; your subcontractors may adjust it for your home.

  1. Hacking and demolition. Remove what is going before anything new is ordered.
  2. Plumbing and electrical, first stage. Pipes and wiring are run while walls and floors are still open.
  3. Masonry and tiling. Screed, waterproof wet areas, then lay tiles.
  4. Air-conditioning piping and trunking, before ceilings and carpentry hide it.
  5. False ceiling and partitions.
  6. Carpentry. Measured on site after tiling, then built and installed.
  7. Painting, with touch-ups at the end.
  8. Shower screens and mirrors, measured after bathroom tiling is complete.
  9. Fixtures and appliances: lights, fans, sanitary ware, switches and sockets.
  10. Curtains and blinds, measured after painting.
  11. Cleaning and final touch-ups, then your defects check.

Three things that catch people out

  • Carpentry is made off site and takes weeks. Confirm it early so it is ready when the site is.
  • Order long-lead materials (tiles, countertops, doors) before the trade that needs them is due.
  • Decide appliance models before carpentry is measured. Cabinets are built around them.

When you start a renovation on My Direct Reno, your dashboard lists the trades for your type of renovation in this order.

General information only, not professional advice.